Columbia River
Wind farm
Source Data
Left bank: Wind farm
Notes: 25,000 ac 217 turbines, 1,000 MW
Memorial Contribution
Documented by Robert Heacock (1957–2025), from Wind Hard from the West: The Lewis and Clark Expedition on the Snake and Columbia Rivers (2015), used by permission of his family.